For Deliveries in The Ports of

NEW YORK HARBOUR, BALTIMORE & NORFOLK

Provided by HARLEY MARINE

IFO/MGO

0-565mts = $7618.75 Flat

566-628mts = $13.45/MT

629-1025mts = $8464.00 flat

1026-1632mts = $8.26/MT

1633-2300mts = $13483.75 flat

2301-2493mts = $5.86/MT

2494-3400mts = $14628.00 flat

Over 3400mts = $4.31/MT

Provided by VANE LINE BUNKERING, INC.

IFO/MGO

0-565mts = $8360.62 Flat

566-628mts = $14.80/MT

629-1025mts = $9310.40flat

1026-1632mts = $9.09/MT

1633-2300mts = $14832.12 lat

2301-2493mts = $6.45/MT

2494-3400mts = $16090.80 flat

Over 3400mts = $4.74/MT

Boom Fee$550 depending on supplier; Minerva $300 from deliveries made from Pennsauken Terminal to NJ, Pennsylvania and Delaware ports.

All deliveries with a 2 port load or discharge will include an additional $2500 shifting charge.

Out of port charges:

138th St., Yonkers = $ 2,275

New Haven = $ 11,500

Perth Amboy Anchorage = $ 2,275

Riverhead = $ 13,500

City Island = $ 2,700

New London = $ 16,500

Execution Rocks = $ 4,700

Jamestown, RI = $ 21,250

Northport = $ 8,700

Pt. Jefferson = $ 9,850

Bridgeport = $ 9,850

Allowable Laytime

Delivery – 150 MT/hour, 4 hour minimum, 18 hour maximum

Loading – 375 MT/hour, 4 hour minimum, no maximum

Demurrage

Tug – $350/ hour

Barge – $250/hour

For deliveries In The Ports Of PHILADELPHIA

VOLUME RATE

0000-0565 Metric Tons $6,704.50 Flat

0566-0628 Metric Tons $11.83 per M.T.

0629-1025 Metric Tons $7448.32 Flat

1026-1632 Metric Tons $7.27per M.T.

1633-2300 Metric Tons $11865.70 Flat

2301-2493 Metric Tons $5.16 per M.T.

2494-3400 Metric Tons $12872.64 Flat

Over 3400 Metric Tons $3.80 per M.T.

Over 3400 Metric Tons $4.74 per M.T.

BOSTON:

RTC380 BUNKER RATES AND CONDITIONS, EFFECTIVE MAY 1ST 2015

BOSTON INNER HARBOR – FROM DEER ISLAND TO AND INCLUDING CHELSEA AND MYSTIC RIVERS

Metric

Tons

Per Ton

 

Flat Rate

 

Surcharge 18%

        

0

 

450

 

$7,018.00

 

$8,281.24

 

451

 

499

 

$15.60

 

$18.41

 

500

 

565

 

$8,591.00

 

$10,137.38

 

566

 

628

 

$15.25

 

$18.00

 

629

 

750

 

$9,680.00

 

$11,422.40

 

751

 

840

 

$12.90

 

$15.22

 

841

 

1025

 

$11,011.00

 

$12,992.98

 

1026

 

1126

 

$10.74

 

$12.67

 

1127

 

2300

 

$15,427.00

 

$18,203.86

 

2301

 

2700

 

$6.78

 

$8.00

 

Booming $300.00 usd

IFO Taxes $0.85 per mt

LSMGO Taxes $1.45 per mt

ADDITIONAL TERMS AND CONDITIONS

Demurrage Rate:

Tug $450.00

Barge $300.00

PROVIDENCE, RI:

  1. 500mts = $13.70/MT, MIN $6,853

501 – 1000mts = $9.60/MT, MIN $9,582

1001 – 1700mts = $6.60/MT, MIN $11,212

JAMESTOWN Anchorage: 0-500mts = $19.70/MT, MIN $ 9,853 and all other non – Providence 501-1000mts = $12.60/MT, MIN $12,582

River and out of port locations1001-1700mts = $8.40/MT, MIN $14,212.

FOR DELIVERIES IN DELAWARE CITY & ALL PORT NORTH OF THE DELAIR

RAILROAD BRIDGE (loading Philadelphia) & YORKTOWN (loading Norfolk)

0-1600 MTS = $14,375.00 Flat Over 1600 MTS = $8.97 mt

For Deliveries in the Port of BALTIMORE (Loading Philadelphia)

0-1000 MTS = $25,300.00 Flat

1001-2000 MTS= $27,830.00 Flat

Over 2000 MTS= $30,360.00 Flat

Allowable Port time: 1500 bbls/hour plus 1.5 hours for load and discharge

Demurrage: $450 p/hour

Two port load/discharge: $2500 flat charge for each additional port

NEW ORLEANS

NEW ORLEANS HARBOR (MILE 76.0 TO MILE 120.1)

New Rate for all suppliers effective Aug 3, 2020:

$ 13,081.00 OR $ 12.11 PER METRIC TON, WHICHEVER IS GREATER

SHIPS WILL BE INVOICED FOR TOTAL QUANTITIES ORDERED AND LOADED.

QUANTITES ARE

BASED ON METERED SHORE FIGURES. WE DO NOT ACCEPT BARGE OR SHIP

FIGURES FOR

INVOICE QUANTIES.

OUT OF PORT CHARGES:

See Miss River mileage points below

INDUSTRIAL CANAL DELIVERIES:

DELIVERIES IN THE INDUSTRIAL CANAL WILL BE MADE AT THE BASIC HARBOR RATE PLUS A

LOCK FEE OF $2,341.00. ALL STANDBY TIME AT THE LOCKS WILL BE AT THE

STATED DEMURRAGE RATE

MINUS FOUR (4) HOURS FREE TIME.

DEMURRAGE RATE:

DEMURRAGE WILL BE CHARGED FOR ANY DELAYS IN EXCESS OF ALLOWED TIME WHICH IS NOT THE

FAULT OF BARGE OPERATORS.

BOAT: $475.00

BARGE: $155.00

NOTICE OF DELIVERY:

BUNKER BUYER OR VESSEL’S LOCAL AGENT SHALL GIVE SUPPLIER AT LEAST

FORTY-EIGHT (48) HOURS ADVANCED NOTICE OF EACH DELIVERY, CONFIRMING

GRADE OF PRODUCT, QUANTITIES,

DELIVERY TIME, TIME AND LOCATION. WHERE FORTY-EIGHT (48) HOURS ADVANCE

NOTICE IS NOT

GIVEN; THEN SUPPLIER SHALL IN NORMAL CIRCUMSTANCES USE REASONABLE

EFFORTS TO MAKE

THE BUNKER DELIVERY IN A TIMELY MANNER.

EQUIPMENT ACCEPTABILITY :

ONCE A BARGE HAS BEEN DEEMED ACCEPTABLE FOR LOADING BY THE

CUSTOMER’S LOADING FACILITY PERSONNEL AND/OR INDEPENDENT SURVEYOR,

SUPPLIER WILL BE RELEASED FROM

ANY AND ALL RESPONSIBILITY AND LIABILITY FOR CLAIMS ARISING OUT OF

PRODUCT QUALITY

DISPUTES UNLESS SAID PROBLEMS WERE DIRECT RESULT OF SUPPLIER EQUIPMENT FAILURE OR SUPPLIER PERSONNEL ERROR.

LOADING REQUIREMENTS:

NO PRODUCT WILL BE LOADED UNLESS THE TEMPERATURE IS AT LEAST 125 DEGREES FAHERNHEIT AT THE SHORE TANK.

SHIP CONNECTION IS MADE BY SHIP VESSEL’S PERSONNEL:

SUPPLIER BARGES ARE EQUIPPED WITH A MINIMUM OF 70 FEET OF FLOW

THROUGH CARGO BOOM AND HOSE INSTALL ON THE DECK. IN ADDITION, EACH

BOAT CARRIES A SUPPLY OF STANDARD REDUCERS. THE DEMURRAGE RATE WILL APPLY FOR ALL DELAYS CAUSED BY DIFFICULT CONNECTIONS REQUIRING EXTRA HOSE OR SPECIAL REDUCERS IN ORDER TO MAKE THE SHIP’S CONNECTION.

STEAMING:

ANY BARGES REQUIRING STEAMING DUE TO COLD PRODUCT LOADED WILL BE AT

THE

DEMURRAGE RATE. PLUS COST OF STEAM $ 315.00

PORT TARIFFS:

SUPPLIER IS NOT RESPONSIBLE FOR ANY CHARGES INCURRED FOR ANY DOCK, PORT OR HARBOR TARIFFS.

GOVERNMENT DELAYS :

ANY DELAYS DUE TO GOVERNMENT AGENCIES (USCG, U.S. CUSTOMS, U.S. ARMY CORPS OF

ENGINEERS, ETC. ) WILL BE CHARGED AT THE STATED DEMURRAGE RATE.

LOADING / DISCHARGE LAYTIME :

LOADING LAYTIME BASED ON 150 METRIC TONS PER HOUR (APPROXIMATELY

1,000 BARRELS PER HOUR) PLUS FOUR (4) HOURS FREE TIME.

DISCHARGE LAYTIME BASED OF 150 METRIC TONS PER HOUR ( APPROXIMATELY

1,000 BARRELS PER HOUR) PLUS FOUR (4) FREE HOURS.

ABORTED DELIVERY:

ABORTED DELIVERY RATE OF $13,081.00 OR 12.11 PER METRIC TON, WHICHEVER IS GREATER.

PUMPBACK CHARGES:

EXTRA CHARGES WILL BEGIN FROM DEPARTURE OF VESSEL UNTIL ALL PRODUCT

IS PUMPED OFF, AT

THE POSTED DEMURRAGE RATE OF $655.00 PER HOUR OR $13,081.00, WHICHEVER IS GREATER.

ADDITIONAL LOADING DOCK:

ALL RUNNING TIMES TO AND FROM ADDITIONAL LOADING DOCKS, ANY

ADDITIONAL DOCK HOSE

CONNECTION AND DOCK DISCONNECTION, AND ANY DELAYS BY INSPECTORS WILL BE AT THE

POSTED DEMURRAGE RATE OF $655.00 PER HOUR. THESE ADDITIONAL CHARGES ARE SEPARATE AND APART FROM ACTUAL LOADING TIMES.

DEBUNKER RATES:

FROM DEPARTURE OF SUPPLIER FLEET UNTIL ALL PRODUCT IS PUMPED OFF AND BARGE IS RELEASED

BY INSPECTOR. FLAT RATE OF $13,081.00 OR $ 655.00 PER HOUR, WHICHEVER IS GREATER.

QUALITY CLAIMS:

ANY CLAIM REGARDING THE QUALITY OR QUANTITY OF THE PRODUCTS

DELIVERED SHALL BE WAIVED UNLESS SUBMITTED TO SELLER IN WRITING,

TOGETHER WITH SUPPORTING

DOCUMENTATION AND REASONABLE DETAILS OF THE FACTS ON WHICH THE

CLAIM IS

BASED, WITHIN SIXTY (60) DAYS FROM THE DATE OF DELIVERY. THE DELIVERY DATE SHALL BE

DETERMINED BY THE DATE ON MARINE BUNKER RECEIPT.

MISSISSIPPI RIVER MILEAGE POINTS

HEAD OF THE PASSES TO BATON ROUGE

LOUISIANA

MILE 0.0 TO MILE 25.9 $23,185.00

MILE MARKER’S

PILOT TOWN ANCHORAGE 1.5 – 6.7

VENICE ANCHORAGE 8.0 – 11.2

BAPTISTE ANCHORAGE 11.3

BOOTHVILLE ANCHORAGE 12.2 – 18.5

FORT JACKSON 19.2

OSTRICA ANCHORAGE 23.5 – 24.4

CHEVRON OSTRICA 25.7

MILE 26.0 TO MILE 46.9 $16,595.00

CHEVRON EMPIRE (CAL-KY DOCK) 27.2

PORT SULPHUR ANCHORAGE 37.5 -39.7

FREEPORT SULPHUR DOCK 39.4

MAGNOLIA ANCHORAGE 45.5 – 46.9

MILE 47.0 TO MILE 55.9 $9,942.00

POINT CELESTE ANCHORAGE 50.0 – 51.0

DAVANT ANCHORAGE 53.5 – 54.5

UBT DAVANT DOCK 55.4

MILE 56.0 TO 75.9 $6,640.00

IMT MYRTLE GROVE DOCK 57

MGMT MYRTLE GROVE 58

HARBOR STATES MYRTLE GROVE 61.5

CONOCO PHILIPS ALLIANCE REFINERY 63

LAGRANGE ANCHORAGE 63.8 – 65.8

WILLS POINT ANCHORAGE 66.5 – 67.6

DOCKSIDE ANCHORAGE 69.9 – 71.5

CHEVRON OAK POINT DOCK 72.6

BELLE CHASE ANCHORAGE 73.1 – 75.2

NEW ORLEANS HARBOR LIMITS MILE 76.0 – 120.00

LOWER 12 MILE ANCHORAGE 78.5 – 80.8

LOWER 9 MILE ANCHORAGE 82.7 – 85.0

MURPHY OIL DOCK 87

EXXON-MOBIL CHALMETTE DOCK 88.2

GENERAL ANCHORAGE 89.3 – 91.6

AMSTAR SUGAR 90.8

ALABO STREET WHARF 92

ANDRY STREET WHARF 92.1

BUCK KREIHS SHIP YARD 92.2

POLAND AVE WHARF 92.8

INDUSTRIAL LOCKS 92.6

GOV. NICHOLS TRAFFIC LIGHT 94.6

CRUISE SHIP DOCK( ERATO & JULIA ST) 95.2

PERRY STREET WHARF 95.9

J.W. STONE OIL DOCK 96.5

IMTT GRETNA DOCK 97.2

7TH STREET WHARF 97.9

HARMONY STREET 98

HARVEY LOCKS 98.3

KINDER MORAN HARVEY 98.4

LOUISIANA AVE 98.7

NAPOLEAN AVE 98.8

FAMM (TEXACO) MARRERO 99

MAGELLEN MARRERO 99.2

MILAN STREET 99.5

NASHVILLE AVE 100.5

PACIFIC MOLASSES WEGO 100.9

HENRY CLAY WHARF 101

NATIONAL GYPSUM WEGO 101.4

PROGRESSIVE BARGE LINE DOCK 101.6

BLACKWATER WEGO 102.4

T.T. BARGE 104.5

ZITO BOUYS 105

HUEY P. LONG BRIDGE 106.1

AVONDALE SHIP YARD 106.6 -107.8

HARAHAN FLEET 108.6

IMTT AVONDALE DOCK 108.7

WAGERMAN BOUYS 109

WOODS BOUYS 110

KENNER BEND ANCHORAGE 113.5 -115.5

J.W . STONE OIL DOCK 114

AMA ANCHORAGE 115.6 -117.3

ADM GROMARK 117.6

IMTT ST ROSE DOCK 118.7

BUNGE GRAIN DESTREHAN 120

MILE 120.1 TO MILE 140.0 $7,304.00

ST CHARLES GRAIN ELEVATOR 120.5

ADM BOUYS 121

GOODHOPE REFINERY 125.7

VELERO ST CHARLES REFINERY 126.9

BONNIE CARRIE ANCHORAGE 127.3 – 129.8

BAYOU STEEL 132

LAPLACE ANCHORAGE 134.7 – 135.0

C.G.B. BOUYS 135

RESERVE ANCHORAGE 137.0 – 137.5

MARATHON/ASHLAND REFINERY (GARYVILLE) 140

MILE 140.1 TO MILE 160.00 $14,574.00

MOUNT AIRE 143.4

OLD KAISER ALUMINUM DOCK 145.1

GRANDVIEW ANCHORAGE 146.5 – 148.7

J.W. STONE OIL –PAULINIA DOCK 150

PEAVY GRAIN 150.4

PAULINIA ANCHORAGE 154

DELTA BULK TERMINIAL 157

SUGARLAND ST JAMES 158

K-2 RIG’S 159

CAPLINE ST JAMES 159.5

MILE 160.1 TO MILE 180.0 $21,873.00

IC RAIL DOCK 161

ZENNOH GRAIN – CONVENT 163.8

LOWER SUNSHINE ANCHORAGE 165. – 165.9

DONLDSONVILLE FLEET 165. – 175.0

UPPER SUNSHINE ANCHORAGE 166.3 – 167.0

CHEVRON/FAMM REFINERY CONVENT 168.1

BURNSIDE TERMINIAL 170

DARROW ANCHORAGE 172.0 – 175.0

MILE 180.1 TO MILE 200.00 $29,144.00

COOPER DARROW 181

ALLIED CHEMICAIL (GEISMAR ) 186.8

WHITE CASTLE ANCHORAGE 191

SUNCO TERMINIAL 198.2

MILE 200.1 TO MILE 235.0 $38,940.00

DOW CHEMICIAL (PLAQUEMINES ,LA) 210

J.W. STONE OIL DOCK BATON ROUGE 225

BATON ROUGE GENERAL ANCHORAGE 225.8 – 227.3

SUN OIL TERMINIAL 227.5

CARGILL TERMINIAL 227.8

PORT ALLEN LOCKS 228.4

LOWER BATON ROUGE ANCHORAGE 228.5 – 229.0

APEX OIL TERMINIAL 229.1

MIDDLE BATON ROUGE ANCHORAGE 229.6 – 229.8

UPPER BATON ROUGE ANCHORAGE 230.6 – 231.0

PLACID OIL REFINERY 231.8

EXXON BATON ROUGE REFINERY 232

KAISER ALUMINUM BATON ROUGE 233.7

MISS RIVER – OUT OF PORT FEES FOR LSMGO DELIVERIES

JOHN W. STONE

Mile: 1.5-25.9 $7,500

Mile: 26-46.9 $4,500

Mile: 47-55.9 $3,000

Mile: 56-75.9 $1,500

Mile: 76-127.9 NIL

Mile: 128-140 $2,000

Mile: 140.1-160 NIL

Mile: 160.1-180 $3,500

Mile: 180.1-202 $4,000

Mile: 203.1-232 NIL

These are subject to change for amount of fuel delivered

CUSTOM FUEL SERVICES

  • Mile markers 50 to 70: $2,500

  • Mile Markers 71 to 76: $1,000

  • Mile markers 160 to 200: $1,500 – Other notes:

o Whenever the river stage reaches or exceeds 12′ as measured at the Carrollton Gauge, there will be a 30% High

Water surcharge applied to the Out of Port fee.

http://rivergages.mvr.usace.army.mil/WaterControl/stationinfo2.cfm?dt=S&sid=01300 o Out of Port fees are subject to adjustment based on operational efficiencies. o CFS does not operate below mile marker 50.

HOUSTON AREA

Barge Rates Effective Jan 1, 2019

FUEL SURCHARGE on BARGE 24%

HOUSTON HARBOR

$ 8.80 MT min $9,515

Wharfage : $0.30/MT min $10.00 if applicable – Effective Jan 1, 2017

Harbor Fee : $33.99 for IFO / Additional $33.99 for MGO

Security Fee : $0.04685 per MT – Effective Feb 1, 2013

Maritime Transportation Security Act compliance fee of (MTSA) – $10.50 flat

GALVESTON/TEXAS CITY

$13.25 MT min $14,330 except BOMIN $12.00 MT MIN $12,975

Texas City Wharfage: $0.0942 p/bbl min $100 – Effective Jan 1, 2017

Dockage (based on barge length): $942.00 – Estimated, to be updated after delivery

Harbor fee: as above

Security fee: as above

BARBOUR’S CUT : $ 10.35 MT min $11,160

BAYPORT : $11.55 MT min $12,490

LAKE CHARLES : $23.75/MT min $25,630 except BOMIN $14.05 MIN $15,205

PORT ARTHUR : $20.85/MT min $22,500

ORANGE/BEAUMONT : $21.70/MT min $23,450

PORT NECHES : $21.35/MT min $23,055 except BOMIN $13.30 MIN $14,365 for the above three ports

BOLIVAR ROADS : $17.95 MT min $19,375 except BOMIN $15.60 min $16,875 FREEPORT : $19.55 MT min $21,120

CORPUS CHRISTI : $8,000 flat

Plains Eagle Ford Terminal. + $10,000

MOBILE

Effective January 1, 2015

$6.25 MT min $5700 + $1500 for McDuffie & Theodore (Atlantic Gulf) $6.55 MT min $6000 + 19% fuel surcharge + applicable out of port fees (Chevron Marine and Martin Energy)

Additional charges for the following locations :

McDuffie & Theodore $1500

Ft. Morgan $1200

Chickasaw $500

Pumpback: (Return Product) $1,200.00 Minimum or $250.00 p/hour Free Time: One hour before and one hour after bunkering. Vessel must accept 188 MTS p/hour.

Other Ports in Mobile Area

Pascagoula, MS : $9.30 MT min $9,300

Gulfport, MS : $10.80 MT min $10,800

Pensacola, FL : $12.95 MT min $12,950

Panama City : $15,850 per barge

Savannah, Charleston and Jacksonville

0000-0565 Metric Tons $6,095.00 Flat

0566-0628 Metric Tons $10.76 per M.T.

0629-1025 Metric Tons $6,771.20 Flat

1026-1632 Metric Tons $6.61 per M.T.

1633-2300 Metric Tons $10,787.00 Flat

2301-2493 Metric Tons $4.69 per M.T.

2494-3400 Metric Tons $11,702.40 Flat

Over 3400 Metric Tons $3.45 per M.T.

For MGO ONLY Deliveries In The Ports Of CHARLESTON, SAVANNAH & JACKSONVILLE

VOLUME RATE

0000-0565 Metric Tons

$7,618.75 Flat

0566-0628 Metric Tons

$13.45 per M.T.

0629-1025 Metric Tons

$8,464.00 Flat

1026-1632 Metric Tons

$8.26 per M.T.

1633-2300 Metric Tons

$13,483.75 Flat

2301-2493 Metric Tons

$5.86 per M.T.

2494-3400 Metric Tons

$14,628.00 Flat

Over 3400 Metric Tons

$4.31 per M.T.

For deliveries in the port of Brunswick (Loading Jacksonville)

0 – 1000 Metric Tons $25,300.00 Flat

1001 – 2000 Metric Tons $27,830.00 Flat

Over 2000 Metric Tons $ 30,360.00 Flat

For deliveries in the port of Fernandina (Loading Jacksonville)

0 – 1600 Metric Tons $14375.00 Flat

Over 1600 Metric Tons $8.97 Per M.T.

VANE LINE BUNKERING Standard Terms and Conditions apply to the foregoing rates.

ALLOWABLE PORT TIME: 1500 Bbls/Hr at load and discharge. DEMURRAGE: $450.00/Hr.

MULTIPLE BARGE DELIVERY: Schedule of Bunker Rates will apply to each individual barge(s) bunker volume.

SHUTOUTS: Return of product subject to an additional charge equal to 50% of the rate.

TWO PORT LOAD/DISCHARGE: Add $2,500.00 flat charge for each additional port.

ASSIST TUGS: if required, for charterer’s account.

FUEL SURCHARGE: based on $2.50/GL

PANAMA CANAL

BARGE

0-500mts min $8500 // $3.60pmt over 500mts

PIPELINE

$0.50 per gross barrel min $750

POLLUTION

$0.05 per gross barrel

OVERTIME

$250 lump sum overtime, weekend and holidays

BARGE SURCHARGE

$750 lump sum

LOS ANGELES / LONG BEACH

Barging

$1.25/bbl ($10,000 minimum)

Wharfage

LA $0.165/bbl LB $0.28/bbl at berth and

$0.165/bbl at anchor

Boom (Load)

$750.00

Boom (Discharge)

$950.00

Anchorage

$500.00 for all deliveries at anchor

California Oil Spill Tax

$0.065/bbl

Federal Oil Spill Tax

$0.08/bbl

California Sales Tax

9% on applicable quantity

Demurrage

$450.00/hour when applicable

Holiday Charge

$250.00/hour (8 hours min.) for barge loading or discharge on a holiday. Please verify holiday schedule with the local office.

Standby Tug Fee

 

$450.00/hour when applicable

SAN FRANCISCO

BARGE

$0.93/bbl min 10,000bbls OR $9,300.00

WHARFAGE

As applicable

ZONE CHARGE

As applicable

BOOM

$2,000 Flat

CALIFORNIA OIL SPILL

$0.05/bbl

CALIFORNIA SALES TAX

8.75% on applicable quantity

DEMURRAGE

Rate depends on quantity

DOCKAGE

As applicable

HOLIDAY CHARGE

As applicable – 30% if applicable

TUGS

$650 per hr

SEATTLE – COLUMBIA RIVER AREA

BOOM FEES

Port Angeles $2,150.00

Anacortes $2,150.00

Everett $2,150.00

Seattle $1,750.00

Tacoma $1,750.00

Columbia River (all) $1,750.00

STANDBY

Port Angeles $2,070.00

Anacortes $2,070.00

Everett $2,070.00

Seattle $1,670.00

Tacoma $1,670.00

Columbia River (all) $1,670.00

CANCELLATION CHARGES

Port Angeles $650.00

Anacortes $650.00

Everett $650.00

Seattle $600.00

Tacoma $600.00

Columbia River (all) $650.00

VANCOUVER, BC, CANADA

Vancouver Harbor & Port Moody – $9,000 flat

ST. EUSTATIUS

AGENCY SERVICE FEE

$900.00

 

ENVIRONMENTAL IMPACT FEE

$950.00

 

MARPOL FEE

$500.00

 

ANCHORAGE FEES (per 24 hours)

0 – 10,000 GRT

$30.00

 

10,001 – 50,000 GRT

$90.00

 

50,001 – 100,000 GRT

$300

 

100,001 & over

$570